Certified

ISO 9001:2008

Number #1

Supplier in Europe

Leading Provider

Of Industrial Solutions

Certified

ISO 9001:2008

Number #1

Supplier in Europe

Leading Provider

Of Industrial Solutions

INDUSTRIAL EFFLUENT TREATMENT SYSTEM (IETS)

INTRODUCTION

Any facility including the effluent collection system, designed and constructed for the purpose of reducing the potential of the industrial effluent or mixed effluent to cause pollution.“ Industrial effluent” means any waste in the form of liquid or wastewater generated from manufacturing process including the treatment of water for water supply or any activity occurring at any industrial premises.

LEGAL REQUIREMENTS

ENVIRONMENTAL QUALITY (INDUSTRIAL EFFLUENT ) REGULATIONS 2009 :

Regulation 5 – Design And Construction Of Industrial Effluent Treatment System

An owner or occupier of the premises shall conduct any design and construction of the industrial effluent treatment system to collect and treat the industrial effluent or mixed effluent generated within the premises in strict compliance with the specifications as specified in the Guidance Document on the Design and Operation of Industrial Effluent Treatment System issued by the Department of Environment.

Regulation 6 – Compliance With Specifications Of Industrial Effluent Treatment System

No person shall operate any industrial effluent treatment system unless it complies with the specifications as specified in sub regulation 5(1).

Regulation 7 – Monitoring Of Discharge Of Industrial Effluent Or
Mixed Effluent

An owner or occupier of a premises that discharges industrial effluent or mixed effluent onto or into any soil, or into any inland waters or Malaysian waters.

service7

Regulation 9 – Performance Monitoring Of Effluent Treatment System

In this regulation, “performance monitoring” means the routine monitoring of certain characteristics to provide an indication that a treatment process is functional and capable of treating the industrial effluent or mixed effluent.

METHODOLOGY

EQUIPMENT
iets1
SAMPLING
iets2

DELIVERY TO CUSTOMERS

REPORT

iets3
EXPLANATION

iets4
SUBMIT to DOE

GLOTEQ  →  DOE
(Assessor) (Endorsement)

Top